Few harbours or rivers are naturally deep, and with the increase in size of vessels operating all navigation channels to enter or leave ports require quick, safe and efficient dredging operations.

Leask Marine Ltd have many year’s experience in maintenance dredging operations and are committed to providing the highest standards of health, safety and quality of workmanship and technical proficiency within the industry.


Leask Marine owns and operates multiple vessels and dredging equipment for your needs. This includes plough dredging or air-lifting systems and while the right equipment is necessary, so is the highly experienced teams that operate the systems.
For ports, harbours or waterways Leask Marine can perform dredging operations while allowing for the safe movement of other vessels insuring limited or no downtime to normal operations. These can be main channel approaches, bar channels, entrance channels or berthing areas. Whether it is periodic maintenance dredging or one-off enlarging, and deepening channels Leask marine can accommodate your needs.
Leask Marine can operate of multiple vessels to plough any sea bed area where larger dredging plant operations have been performed to level off the seabed.

Leask Marine have successfully undertaken plough dredging operations using their 55-ton A-frames together with 10-ton (10-metre) and 12.8-ton (12-metre) ploughs.
All Leask Marine multicats are fully equipped for ploughing operations and have successfully completed projects for clients including: Port of Cromarty, Invergordon, Stornoway Deep Water Port, Port of Harwich, Heysham Port, Hull Estuary, Portsmouth Port, Ardersier.